Standard Work
Instructions:
Standard Work on how to maintain Social Distancing Sneeze Guard
Plastic Sheeting at a USPS location
Tracking:
COVID19SocialDisv4.9
Purpose:
To limit the exposure of COVID-19 at the retail counter
Updated on:
4-2-2020
Version 1.3
Steps Key Points
Visit the HQ COVID-19 Website:
https://blue.usps.gov/blue/covid-
19/welcome.htm
Link to Site
The official
source of USPS
COVID-19
information is
on the USPS
Blue Page.
1. Prior to proceeding review Asbestos Survey to ensure you are not
disturbing asbestos.
2. Prior to proceeding review Lead Survey to ensure you are not
disturbing lead.
3. Survey the area to be used to screw in to and ensure there is not an
electrical hazard present
4. Ensure sheeting is not hanging to the ground and could potentially
cause a tripping hazard
Pub129
Plastic Sheeting to length of the Window Counter
1. Method to hang curtain
a. Command Hooks to attach to wall above retail counter.
b. 2-3 dozen Grommets and a Grommet tool (if needed for
sheeting)
2. All items can be purchased from a regular hardware store.
Parts Needed
1. Avoid drilling where possible, instead utilize self adhesive hooks.
2. Cut the plastic sheeting to the proper length to cover the entire Window
Counter
3. Add grommets to the plastic sheeting every 12 inches
4. Attach plastic sheeting to Command Hooks with grommets
5. Slits may be cut in the sheeting to allow for customer/employee pass-
through. However, this should NOT be directly in front of the employee
Installation
Procedures
*Reference
slide 2*
Go to Website Parts Needed
Installation
Procedures
Safety
Standard Work
Instructions:
Standard Work on how to maintain Social Distancing Sneeze Guard
Shower Curtain at a USPS location
Tracking:
COVID19SocialDisv4.10
Purpose:
To limit the exposure of COVID-19 at the retail counter
Updated on:
4-2-2020
Version 1.3
Steps Key Points
Visit the HQ COVID-19 Website:
https://blue.usps.gov/blue/covid-
19/welcome.htm
Link to Site
The official source of
USPS COVID-19
information is on the
USPS Blue Page.
1. Prior to proceeding review Asbestos
Survey to ensure you are not disturbing
asbestos.
2. Ensure hooks are secured well enough to
wall even if glue is needed.
3. Use adhesive hooks to hang the sheeting
4. Be mindful of any/all hazards when
placing the sheeting, whether they be
electrical or otherwise
Safety Considerations
Pub 129
1. Cut Shower curtain to length of the
Window Counter
2. Method to secure to building
• adhesive hooks installed across
the top of counter line to hang
curtains from
3. All items can be purchased from
regular
hardware stores
Parts Needed
1. Hang from ceiling or wall using Command
Hooks
*Reference Slide 2*
Installation Procedures
Go to Website Safety Parts Needed
Installation
Procedures